Membrasec Transparant
Studded membrane for the immediate finishing of humid and salty walls after injection or as wall drainage.
Processing: | Drill a hole in the blisters of diam. 6 mm ant 30 mm depth. Leave enough space between the holes. For plain walls the space needed is 35 cm, for irregular walls 20 cm is recommendend. This means 18 to 32 plugs are needed per square meter. Place the plugs in the hols, and smash them into the wall with a hammer. |
Consumption: | 18 - 32 plugs per m² |
Packaging: | Box of 500 pc |
Studded membrane for the immediate finishing of humid and salty walls after injection or as wall drainage.